Fiber optic cable construction is roughly divided into the following steps: preparation → routing project → fiber optic cable laying → fiber optic cable splicing → project acceptance. Preparation (1) check the design information, raw materials, construction tools, and equipment. To this end, overhead optical cable construction generally has the following eight steps. Choose the type of pole The basic pole height is 7m and the tip diameter is 150mm. Hanging wire support overhead method, this method is simple and cheap, and is the most widely used in my country, but it takes time to add hooks and arrange. (2). A passive optical network uses optical splitters to distribute signals from one central optical line terminal (OLT) to multiple optical network terminals (ONTs) without requiring powered network equipment in between.